This comprehensive, user-friendly Risk Assessment and Method Statement (RAMS) template is designed for a wide range of projects. This editable and brandable MS Word document is perfect for ensuring the safety and efficiency of your work, no matter the industry or project size.
Why Choose Our RAMS Template?
Comprehensive and Detailed
Introduction and Purpose: Clearly defined objectives to ensure all personnel understand the importance of safety and compliance.
Scope of Works: Detailed outline covering maintenance, upgrades, repairs, and inspections, tailored to various projects.
Thorough Risk Assessment
Hazard Identification and Risk Evaluation: Systematic approach to identifying potential hazards, assessing risks using a 5×5 risk matrix, and implementing control measures.
Residual Risk Rating: Evaluation of risks after control measures to ensure they are minimised to acceptable levels.
Method Statement
Step-by-Step Procedures: Comprehensive guidance on preparation and planning, including site induction, permits, materials and equipment lists, and detailed work execution procedures.
Emergency Procedures and Waste Management: Clear protocols for first aid, fire safety, emergency responses, and environmentally friendly waste disposal.
Control Measures
Personal Protective Equipment (PPE): Specific requirements for safety helmets, gloves, high-visibility vests, and more, ensuring maximum protection for all workers.
Isolation and Lockout/Tagout: Detailed procedures to safely isolate systems, preventing accidental activation during maintenance.
Monitoring and Review
Daily Inspections and Ongoing Risk Assessments: Regular checks to maintain a safe working environment and update risk assessments as needed.
Feedback and Reporting Mechanisms: Structured system for reporting hazards, near-misses, and safety concerns, fostering a culture of continuous improvement.
Permits and Approvals
Comprehensive Permit Checklist: Includes confined space entry permits, lockout/tagout permits, hot work permits, and more, ensuring all necessary approvals are obtained and documented.
Customisable and User-Friendly
Fully Editable: Our RAMS template is provided in MS Word format, allowing you to easily add your branding, modify content, and tailor it to your specific project needs.
Clear and Concise Layout: Professionally formatted with a table of contents, making it easy to navigate and find the information you need.
How to Use Our RAMS Template
Add Your Branding: Customise the document with your company logo and details to make it your own.
Edit Project-Specific Information: Fill in the project name, client name, site location, and other relevant details.
Review and Customise: Modify any sections to suit the specific requirements of your project, including risk assessments and control measures.
Implement and Monitor: Use the document to guide your team through every phase of the project, from planning and execution to monitoring and review.
Our RAMS template helps you manage risks, ensure safety, and comply with all relevant regulations. By providing detailed procedures, comprehensive risk assessments, and clear control measures, this document is an invaluable tool for any project.














Reviews
There are no reviews yet.